Agglomeration process productivity increasing by a sinter mix preheating
creativework.keywords | Pelletizing, Sinter cake, Sinter mix temperature, Water heater | |
creativework.publisher | University of Chemical Technology and Metallurgyjournal@uctm.edu | en |
dc.contributor.author | Shapovalov A. | |
dc.contributor.author | Dema R. | |
dc.contributor.author | Kalugina O. | |
dc.contributor.author | Kharchenko M. | |
dc.contributor.author | Nefedyev S. | |
dc.contributor.author | Koldin A. | |
dc.contributor.author | Mihailov E. | |
dc.date.accessioned | 2024-07-16T11:16:49Z | |
dc.date.accessioned | 2024-07-16T11:18:56Z | |
dc.date.available | 2024-07-16T11:16:49Z | |
dc.date.available | 2024-07-16T11:18:56Z | |
dc.date.issued | 2019-01-01 | |
dc.description.abstract | To increase the productivity of the agglomeration process, preheating of the charge is proposed. A series of industrial experiments was carried out on the sinter machine No. 1 of the sinter department of JSC ``Ural Steel``. The dynamics of the sinter mix temperature during the technological stages of its preparation from pelleting to loading on pallets was studied, depending on a water temperature change during pelletizing. It was defined that for the winter working of the sinter department of JSC ``Ural Steel`` the water temperature increase which supplied of the pelletizer to moistening, for every 10°C, facilitates an increase in the temperature of the sinter mix on the pallets by 1.5-2.0°C. Therefore, for stable sinter mix production with a temperature higher than 55°C, it is necessary to supply a pelletizer with water, which temperature is at least 85°C. To implement the proposed technology, it is necessary to equip the sinter machines with water-heating recuperative heater, installed above the sintering machine behind the ignition hood and using heat, radiated from the surface of the sinter. | |
dc.identifier.issn | 1314-7978 | |
dc.identifier.issn | 1314-7471 | |
dc.identifier.scopus | SCOPUS_ID:85076552658 | en |
dc.identifier.uri | https://rlib.uctm.edu/handle/123456789/1261 | |
dc.language.iso | en | |
dc.source.uri | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85076552658&origin=inward | |
dc.title | Agglomeration process productivity increasing by a sinter mix preheating | |
dc.type | Article | |
oaire.citation.issue | 6 | |
oaire.citation.volume | 54 |